Remove existing bathrooms, linings and dispose of them. Prep for new bathroom Layouts for items supplied by myself. Line with 13mm Aqualine gib, stopping, waterproofing, tile showers, and floor tiles supplied by myself. To supply 10mm frameless glass & doors to both showers. Reframe and putting in door sliders position and one wall change and paint the bathrooms and affected ceilings.
#1 | Tradie 1 |
|
15 jobs | No longer in contact |
#2 | Tradie 2 |
|
138 jobs | No longer in contact |
#3 | Tradie 3 |
|
255 jobs | No longer in contact |
#4 | Tradie 4 |
|
121 jobs | No longer in contact |
#5 | Tradie 5 |
|
15 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 20 jobs | No longer in contact |
Partner with Builderscrack
Get work