Bathroom approx. 1.7m x 1.7m, Separate WC 0.80mx1.80m. Work requires: - Remove both bathroom and wc floor vinyl(4.33m²) and bathroom wall lining(10m²) and re-gib the entire bathroom (16.32m²) to accept new wall covering. - Remove all fittings in bathroom and WC(shower rail/cabinet/vanity/mirror/toilet). - Repaint the bathroom wall(exclude the shower wall) for about 6m² Don't worry about tiling works as I work in tiling trade.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
I would recommend Mark to everyone, very prompt and polite communication, fast and impress work,couldn't be better! Will definitely use him if I have more work to do.
Work carried out by the owner/operator
Reviewed on 14-03-2019