3 panels of wet wall lining. Previous wet wall lining either needs to be pulled down or sanded back and the new wall placed on top. Only equipment needed will be saw/drill to cut out holes for shower, taps etc and a workbench. There will be another worker onsite who can help with lifting and installation
Partner with Builderscrack
Get work