I need an LBP to install a below ceiling beam to replace a load bearing wall, install a small window and attach 2.8m of bracegib. Linings have already been removed. Building consent has been issued. Work needs to be completed by xmas.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Jeremy was a pleasure to work with and added extra value by suggesting changes and dealing directly with the architect. Ended up saving us money! thanks for the great job.
Work carried out by the owner/operator
Reviewed on 11-10-2017
Partner with Builderscrack
Get work