Creating a new exit/back door. Onto a new deck, landing and stairs-window where the new door will be, brick to be cut through to create door. A room that has been added on needs to be reclad, spouting needs to be look at/replaced. Insulation added. Existing door in extention needs to be lowered to the level of the deck and larger door installed.
#1 | Tradie 1 |
|
169 jobs | No longer in contact |
#2 | Tradie 2 |
|
32 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 5 jobs | No longer in contact |
#4 | Tradie 4 |
|
42 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 0 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 1 job | No longer in contact |
#7 | Tradie 7 |
|
8 jobs | No longer in contact |
#8 | Tradie 8 |
|
73 jobs | No longer in contact |
Partner with Builderscrack
Get work