- Remove existing shower wall lining and tiles, remove floor tiling. - Install steel enamel shower base (supplied and pictured below) - Re-line shower 3 sides (approx 3.7 m2) and fit supplied shower base (750mmx900mm) - Waterproof and re-tile shower (approx 3.7 m2 tiling - tiles supplied) - Re-tile bathroom floor (approx 3.5 m2 tiling - tiles supplied) - Remove demo waste - Re-use Shower Door if possible - Toilet and vanity are in good condition and will remain Please itemize quote and outline time-frame as much as possible.
#1 | Tradie 1 |
|
333 jobs | No longer in contact |
#2 | Tradie 2 |
|
33 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 11 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 5 jobs | No longer in contact |
#5 | Tradie 5 |
|
37 jobs | No longer in contact |
#6 | Tradie 6 | Not reviewed | 0 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 10 jobs | No longer in contact |
Partner with Builderscrack
Get work