Bathroom: We have 2 x bathrooms (of which 1 x ensuite) that need the following work: - remove old and install 2 x new toilet suites - remove old and install 1 x new shower stall with shower head and mixer - reseal 2 x mirros - ensuite has bathtub with showerhead - replace liner with tiles Painting: - Repaint the whole house ( 3 bedroom house with 2 bathrooms) Carpet: - Remove old and install new carpet for the whole house - total floor area approximately 128 sqm Electrical Fittings: - replace all electrical fittings - approximately 16 light fittings, 12 outlets and 12 switches Timeframe: - Work needs to be completed / turned over by first week of February
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
I must say Bobby has been very patient with us throughout the whole process. He gave recommendations and advise whenever we wanted to have some add-ons. Communication was always open. His contractors were also nice, friendly and approachable. Their workmanship was really good. We especially like our carpet! 😊 I would highly recommend Bobby to everyone.
Work carried out by the owner & subcontractors
Reviewed on 24-02-2020
Partner with Builderscrack
Get work