Some water damage behind shower and in the bedroom next door which will require new jib. Ceiling requires painting and vynal floor replaced. Bathroom is small maybe 8-10sqm.
#1 | Tradie 1 |
|
4 jobs | No longer in contact |
Partner with Builderscrack
Get work