We have a Geo-tech report. Council needs a Earthworks plan to sign off my Resource consent. Need to show details of the piles for the 65m2 minor dwelling. The excavation for the septic tank (5m x 2.5m x 1.8deep) and a small 10m x 1m footpath.
#1 | Tradie 1 |
|
2 jobs | No longer in contact |
Partner with Builderscrack
Get work