House has been relocated with an issues BC, the majority of internal plumbing is complete, the house needs to be connected to the mains, with a new water connection. The house needs to be transitioned from gas Heating to a Hot Water Cylinder and the Landry installed. The section also requires a 10 cubic metre stormwater attenuation tank. House is currently on site in Kamo awaiting to be lowered onto foundations.