Hello clever water people. Project is : 1) to add a new outdoor tap feed just after the mains valve. 2) to reset tops of 2x gully traps so that the old drains terminate below the grilles and don’t collect with leaves and overflow. Photos below. The side of the house one is for the new tap. The valve is under gravel about 3m away.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
great working with the Wilco team
Work carried out by an employee of the company
Reviewed on 12-08-2022
#1 | Tradie 1 |
|
73 jobs | Secured job |
#2 | Tradie 2 |
|
6 jobs | No longer in contact |
#3 | Tradie 3 |
|
75 jobs | No longer in contact |
Partner with Builderscrack
Get work