Drainlaying required in Miramar

Job image

Job description

Drainlaying
Wellington

Sourcing a quote for drain laying. The pipe run is 80-100m long. This needs 2x 110mm PVC pipes for a residential property. This includes connecting the sewer to the main underneath the road and getting the council to inspect the connection being made. A small section of existing ceramic sewer pipe will need to be replaced and reconnected so this might require an additional 20m of pipe. I would like this work to be wrapped up in March next year if possible. I am looking at digging the trench myself for this work (excluding the road stuff). Let me know if you would be interested in doing this work.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Would recommend Too Easy for future work. Very flexible and great communication. Passed the council inspection with no issues.

Work carried out by an employee of the company
Reviewed on 25-04-2022

Verified Builderscrack review

Trade professionals

#1 Tradie 1
26 jobs Secured job
#2 Tradie 2
75 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo