Our weatherboard house has inadequate ground clearance to a tiled concrete path which runs flat along the back and then slopes down either side - it appears that runoff is damaging areas of timber and possibly getting under the house and causing damp issues. We'd like someone to assess the job and give some options and quotes for how to fix. I can remove the existing concrete if that will make it easier and provide more options - we are looking to replace the path at some stage anyway (possibly with pavers). Ideally we'd like to get this work completed on at least 1 side of the house in the next 4 to 6 weeks so we can prepare a site for a heat-pump outdoor unit.
Partner with Builderscrack
Get work