Plumbing for bathroom renovation. Move toilet waste, vanity plumbing and shower plumbing. There will be a hole cut in the floor for access and a hole in the deck to access the gully trap to improve access to the area as there is little clearance under the space. (as recommended by a plumber who came to the house to give an estimate.) You will be working with my father who does the carpentry and who will install the vanity, shower and seratone wall coverings. The plan is to move the shower to the right, the vanity to the left and the toilet to under the window.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 03-01-2020
Tradesperson reply
"Thanks for your review. was a great project and a great outcome. I hope you enjoy your new bathroom.:)"