Archived job

Curdin Krummenacher

Job image

Job description

New Drainlaying Karori, Wellington

Published on 29th April 2017

Our water main needs replacing as it appears to be leaking in a couple of places The distance between the toby at the road and the inlet by the house is approximately 10 metres, 8 of which are under a concrete footpath and the other two under soil. Please provide costing options with and without replacing the concrete.


Trade professionals

#1
Tradie 1
unrated
36 jobs
No longer connected
#2
Tradie 2
unrated
44 jobs
No longer connected

Get connected now with NZ’s largest trade professional network

Get started