Published on 23rd November 2025
I have a rental property that our long term tenants are vacating. We would like to have a new shower (with shower dome), bath (will possibly need to be a triangle bath, but happy to take direction), and flooring installed in the upstairs bathroom. The job would need to start from the 9th December, but I can arrange access prior to that to measure up and quote. Photos included are of the current set up.
| Workmanship |
5.0
|
| Cost |
5.0
|
| Schedule |
5.0
|
| Communications |
5.0
|
""
Work carried out by an employee of the company
Review posted by Murray on 3rd February 2026
"Thank you Murray"
3rd February 2026
Verified Builderscrack review
Partner with Builderscrack
Get work