The following work is required : Break the existing concrete driveway and dispose debris from site ( 5-7 square meters) . Excavate to discover existing SW pipe ( shallow excavation ) . Supply & install new 600 mm dia chamber over the existing SW line 100 mm dia including documentation and quality records of the new chamber. ( Probably AC inspector will come at this stage). Supply & install 100mm new SW pipeline for lot connection - approximately 15m. Allow for backfill and testing. Allow for termination flange on pipe as no connection is available yet. CCTV of the new line. Reinstate concrete driveway with 20MPa concrete , iron mesh and smooth finish of surface. Provide builders sign off for council. Design plans are available upon request. Building Consent and as-built survey will be coordinated by owners and excluded from scope.
#1 | Tradie 1 |
|
2 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 3 jobs | No longer in contact |
#3 | Tradie 3 |
|
10 jobs | No longer in contact |
Partner with Builderscrack
Get work