4m Clay pipe replacement with PVC

Job image
Job image
Job image

Job description

Drain Repair & Inspection
Waitakere

Following the CCTV inspection of the earthenware 100mm Sanitary Sewer drainage we have identified and located a 4m section with various breaks and cracks with tree root intrusion causing blockages. It has been suggested that we should also upgrade the existing Gully Trap with a new PVC Gully. Estimates appreciated.


Review

Workmanship
5.0
Cost
3.0
Schedule
4.0
Communications
5.0

Work completed in one day. Warren was prompt with communication and did a good job.

Work carried out by the owner/operator
Reviewed on 23-10-2018

Tradesperson reply
"Good to work for ,and quick to pay.many thanks."

Verified Builderscrack review