a couple of jobs, 1. increase hot water pressure preferably all round but at the very least in the shower. we have a pump for the cold water off the tank which is ok but the hot water flow is terrible. job 2 is add a tap off the feed from one water trough so we can add another trough
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Would recommend Fraser.
Work carried out by the owner/operator
Reviewed on 26-09-2017
Partner with Builderscrack
Get work