Outdoor cylinder is in place and needs connecting to existing hot and cold water on other side of the wall, there is a drain approx 1.5m away. Drywall has been removed from existing cylinder/bathroom wall so access is pretty good. Vanity next to existing cylinder will need connecting after cylinder and piping are removed removed. Lower drywall under existing cylinder also removed for access. Most materials are on site, valve kit, piping etc.
#1 | Tradie 1 |
|
48 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 27 jobs | No longer in contact |
Partner with Builderscrack
Get work