We have two main jobs for early July. Firstly we're looking to replace our shower with a slightly bigger one, which would involve removing a half-wall. The new shower will have flat acrylic lining and have a corner drain - the current drain is on one side so may need to be moved slightly. The shower head is attached above the existing shower so needs to be moved lower and replaced with a slider/rail. We would also like a shower dome installed. The second job is plumbing in a dishwasher, we have diagrams from the LIM report showing the location of pipes. We aren't sure where the best location is or what the floor is made of. We want to make sure everything is consented properly too.
Partner with Builderscrack
Get work