1) Disconnect shower ( no longer need 2 heads in shower) - see photo 2) reposition toilet tap higher up wall to suit back to wall toilet - see photo 3) reposition drainage pipe to suit wall hung vanity (see photo) All of the above in preparation for wall lining. 4) replace cracked vanity top ( see attached photo). I purchased new vanity top ( like for like)
#1 | Tradie 1 |
|
48 jobs | No longer in contact |
#2 | Tradie 2 |
|
15 jobs | No longer in contact |
#3 | Tradie 3 |
|
15 jobs | No longer in contact |
Partner with Builderscrack
Get work