Review

Urgent water leek

Job description

Renovation & Repair
Tauranga

Council came to read our water meter and discovered its reading was extremely high. Apparently we need a registered plumber to find and fix the problem in 14 days. This is what they have told us: the water meter reading taken on 2 December was 318 cubic metres (m3), showing that 207 m3 of water had passed through the meter since 29 August at an average rate of 2.17 m3 per day. When we checked the meter on 4 December the reading was 325 m3. The meter was turning. We have personally had a look at the metre and its turning quickly, with no water on in the house at all. We noticed a soggy patch of water not far from the metre near our fence line.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Very impressed with the great communication, speed at arrival and getting the job fixed. Would definately use him again for any future issues.

Work carried out by the owner/operator
Reviewed on 11-12-2019

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo