I need to have the bath, toilet and vanity re-plumbed and I have a real old pipe with an inflow tap for the toilet and so want an alternative to that. There will possibly be a kitchen unit plumbing later on. The bathroom will be started on the 10th April.
#1 | Tradie 1 | No recent reviews | 12 jobs | No longer in contact |
Partner with Builderscrack
Get work