8x3 cabin needs plumbing and gas fitting, will require pipe out and fit off for shower, toilet, vanity, kitchen sink, 2 burner gas job and an infinity 16l gas water heater, wastes are only through the floor no connection needed at this stage. I need the pipe out done next week if possible as my last plumber has let me down and we have a tight delivery deadline. More details and plans supplied on contact.
#1 | Tradie 1 | Not reviewed | 0 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 59 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 211 jobs | No longer in contact |
Partner with Builderscrack
Get work