One toilet (fixed to timber base) needs fixing to the floor. Floor is concrete with vinal planks on the surface. I'm thinking a couple of bolts into the floor. Shouldn't take more than 1.5 hours
Workmanship |
5.0
|
Cost |
3.0
|
Schedule |
5.0
|
Communications |
4.0
|
Reviewed on 20-11-2019
Partner with Builderscrack
Get work