We are wanting a full replumb done including main line from Toby to the house, we have removed gib where plumbing needs to be done, move the toilet from the laundry into the bathroom approx 6 -7 metres in which the bathroom is currently an empty shell ready to be replumbed for new shower vanity and toilet, we have purchased all new tapware shower, toilet, vanity, laundry tub and outdoor hot water cylinder (just waitingfor shower to be delivered). Needing a quote for all of this work to be done and when it can be done. We can dig trench for the main line and have made a concrete slab for cylinder to sit on Pic 1 laundry Pic 2 bathroom Pic 3 new bathroom layout Pic 4 distance from front for new water line to run to front of house Pic 5 hot water cylinder to be placed between the 2 windows (concrete down since pic was taken)
#1 | Tradie 1 |
|
11 jobs | No longer in contact |
Partner with Builderscrack
Get work