Active job

Full replumb, move toilet install hot water cylinder

Job image
Job image
Job image
Job image
Job image

Job description

Renovation & Repair
Rotorua

We are wanting a full replumb done including main line from Toby to the house, we have removed gib where plumbing needs to be done, move the toilet from the laundry into the bathroom approx 6 -7 metres in which the bathroom is currently an empty shell ready to be replumbed for new shower vanity and toilet, we have purchased all new tapware shower, toilet, vanity, laundry tub and outdoor hot water cylinder (just waitingfor shower to be delivered). Needing a quote for all of this work to be done and when it can be done. We can dig trench for the main line and have made a concrete slab for cylinder to sit on Pic 1 laundry Pic 2 bathroom Pic 3 new bathroom layout Pic 4 distance from front for new water line to run to front of house Pic 5 hot water cylinder to be placed between the 2 windows (concrete down since pic was taken)


Trade professionals

#1 Tradie 1
11 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo