Need to redefine and existing open drain to council standards and lay coil underneath. The drain is approximately 40 meters. Also need to redo two concrete vehicle crossings to the correct gradient and AT approval to prevent road water flooding the house. Job needs to be done before March 2021.
#1 | Tradie 1 |
|
138 jobs | No longer in contact |
Partner with Builderscrack
Get work