We have installed a new outside shed that has a shower and toilet. We need to connect the shower/toilet to the septic tank located on site. The distance from the toilet to the septic tank is approximately 30 metres. A new drain will need to be dug to meet the septic tank
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
3.0
|
Be aware of communicating cost over run. We were okay to pay but did not anticipate 20% cost over run/variation
Work carried out by the owner/operator
Reviewed on 04-09-2018
Tradesperson reply
"-Hard fill supplied is always extra as it is a variable, this was tagged out in the initial quotation.
-there was extra drainage work carried out as an existing, buried downpipe line was in the path of the new sewer line installation. Hence there being a cost over run on this job.
-I always do my best to keep to the initial costing on all jobs but sometimes there is extra work/materials required outside my quotation from which the cost gets passed on."