Post job.
Choose tradie.
Easy.

With thousands of tradies across NZ, Builderscrack has your job covered

Doment Drainlaying

Job description

closed
Posted 2 years ago

Connect existing house to a new manhole as attached to existing waste water.
Connect a stormwater to existing stormwater 800mm in neighbours section
Run new waste water for front lot and connect to new manhole.

From Surveyors
I have spoken with WSL inspectors and what we propose is acceptable.
Attached is the WSL standard for a 675mm wet chamber.
Use this over the existing connection and then lay away up to the front lot in private.
This can be done on the building consent you have for the rear house as it is shown on these plans.
The chamber in the detail cannot be more than 0.90m deep.

Tradies chasing

Tradie 1 4 jobs No longer in contact
Tradie 2 1 jobs No longer in contact

Review for this job

Communication
 5
Get started now! Post your job for free and find the right tradie. Post your job for free, now!