1. Remove tap and move pipe work from above kitchen bench to under proposed new bench. 2. Move dishwasher pipe work to suit new proposed location. 3. Return to fit and connect new supplied basin and tap ware, and dishwasher if required. Step 1 needed in a few weeks time, step 2 about 2 weeks later
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 06-04-2022
Partner with Builderscrack
Get work