This job should be straight forward to quote. I will ONLY consider response that include a quote that covers the work. We are looking to buy a fridge with a ice maker but our house is not plumbed for the fridge. Luckily enough the wall the fridge is on already has plumbing in it, and should be an easy job. See 1st photo of where I think we should be able to access the cold water pipe on the fridge side of the wall. I'm looking for some to: 1. Cut whole in the GIB Plaster board 2. Tap into the existing water line (not sure what kind of pipe it is, house was built 8 years ago). 3. Cover the hole in the GIB Plasterboard with some kind of cover to look neat and tidy. 4. Provide a shut off valve for the pipe going to the fridge. 5. Drill and feed the pipe through to the fridge area (3rd photo) 6. Not sure of where the connection on the back of the fridge will be yet as we haven't bought it yet, please provide about 4m of pipe so it's easy to pull the fridge out without having to disconnect it. 7. Provide producer statement for the new plumbing. Ask me more questions if you have them. I think this job is very straight forward to quote and will only consider response that include a quote that covers all the work. Time frame: anytime in the next 2 weeks would be good.
#1 | Tradie 1 |
|
120 jobs | No longer in contact |
#2 | Tradie 2 |
|
9 jobs | No longer in contact |
#3 | Tradie 3 |
|
97 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 151 jobs | No longer in contact |
Partner with Builderscrack
Get work