Need to have the plumbing moved for the new room layout. All plumbing disconnected below the floor so all new connections needed. Picture 1 - new position for washing machine needing new tap/waste Picture 2 - install in wall toilet Picture 3 - bring up new taps and move waste to centre of adjacent wall Picture 4 centre waste and bring up new connection for floor mount bath filler, remove the other waste.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 07-03-2024
Partner with Builderscrack
Get work