Active job

Double Bathroom reno

Job image
Job image
Job image
Job image
Job image

Job description

New Home Plumbing
Napier

Bathroom in main house needs to remodeled 3mx7m, also adding bathroom to sleepout 3x4. Already have contractor sorted fir walls and such now need a plumber for install of hot water system new basin toilet shower etc. Plumbing work to be completed in two stages, installation sleepout Bathroom stage 1 to be completed end if November then the remodel inside the main house stage 2 to be completed start of December. Plans can be provided upon request. Detailed quote and contract.


Trade professionals

#1 Tradie 1
21 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo