Bathroom in main house needs to remodeled 3mx7m, also adding bathroom to sleepout 3x4. Already have contractor sorted fir walls and such now need a plumber for install of hot water system new basin toilet shower etc. Plumbing work to be completed in two stages, installation sleepout Bathroom stage 1 to be completed end if November then the remodel inside the main house stage 2 to be completed start of December. Plans can be provided upon request. Detailed quote and contract.
#1 | Tradie 1 |
|
21 jobs | No longer in contact |
Partner with Builderscrack
Get work