As per picture, need pipe replaced. Dont understand why the sewage pipe was 2 cm from the surface
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Highly recommended. Was able to do the job on the same day as quote
Reviewed on 29-12-2021
Partner with Builderscrack
Get work