Hi, we are currently subdividing and building a new house on the rear of our section. the services have been connected from the mains in the road to our side of the boundary but we still need to lay the full length of everything all the way up the drive way to the house. about 40m long. a rough quote and an estimation of when the job could be done would be great and then we could go from there. thanks in advance
#1 | Tradie 1 | No recent reviews | 1 job | No longer in contact |
#2 | Tradie 2 |
|
33 jobs | No longer in contact |
#3 | Tradie 3 |
|
28 jobs | No longer in contact |
Partner with Builderscrack
Get work