Removal and disconnection of exieting hallway gas heater. Tonne of space under the house if required to remove piping. Replacement of dux quest in ceiling. There is about 2ms of the stuff that needs replacing right next to the man hole. Good access in ceiling.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 28-11-2021
Partner with Builderscrack
Get work