Review

Trench and Drainlaying

Job description

Drainlaying
Hutt Valley

Drainlayer required to connect a sump to one downpipe and the existing stormwater drain on the property. Trench to be approximately 12 metres long - about 9 metres of the trench is dirt and about 3 metres requires concrete to be broken, removed and then path reinstated. - Trench digging - Drainlaying - Concrete breaking


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo