The guttering and down pipes are installed but need to be connected to storm water drains. The house was moved onto the section and work stopped for Covid. The storm water drains are in place. The down pipes need to connected up under the house. I have another 6 months before certificate of compliance is due. I also need my gas hob connected to the gas califont. Maisie Robertson
#1 | Tradie 1 |
|
27 jobs | No longer in contact |
Partner with Builderscrack
Get work