We need a drain layer who can come over with us to Rakino Island on the 11th Dec on the barge. The barge leaves from Half Moon Bay at 9.30am and returns at 12.30pm We have a septic system to be connected,
#1 | Tradie 1 | No recent reviews | 20 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 5 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 2 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 8 jobs | No longer in contact |
Partner with Builderscrack
Get work