1st Lift the toilet so the lino can be layed and then put back down 2nd in The kitchen put a tap in a new bench top and disconnect the pipes coming out of the top of the wall old style
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Good communication good and professional job very happy with the results will use them again on the bathroom
Work carried out by the owner/operator
Reviewed on 15-07-2019
Partner with Builderscrack
Get work