Plumbing required for new en-suite, which is currently a bare room. Plumbing needed for toilet, vanity and shower. Need connecting to septic, which is higher than the en suite, so pump probably required.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very pleased with work undertaken so far. Work completed as far as possible, with follow-up work required in future when further house renovations undertaken.
Work carried out by the owner/operator
Reviewed on 03-06-2018
Partner with Builderscrack
Get work