Cap off hot and cold bath taps inside wall cavity. Plumb in fitting for shower rose on wall. Cut channel in concrete pad and through exterior wall to accomodate new waste trap and outflow pipe. Then pipe to main waste pipe. Bath will be removed before work starts.
Partner with Builderscrack
Get work