Published: 3 June 2024
Needing supply and installation of a S Bend Right side vented toilet bowl. Vented through the wall. Current toilet estimated 35 to 40 years old. Rectangular base.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
The job was quoted to git new toilet, tongue and groove floor, new skirting. Arrived fully prepared with everything needed for the job. Fantastic workmanship, Daylen is such a neat guy, very friendly, even shouted my partner a coffee!
Work carried out by the owner/operator
Reviewed on 20-06-2024
Partner with Builderscrack
Get work