Review

Toilet supply and install

Job image
Job image
Job image

Job description

Toilets
Christchurch

Published: 3 June 2024

Needing supply and installation of a S Bend Right side vented toilet bowl. Vented through the wall. Current toilet estimated 35 to 40 years old. Rectangular base.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

The job was quoted to git new toilet, tongue and groove floor, new skirting. Arrived fully prepared with everything needed for the job. Fantastic workmanship, Daylen is such a neat guy, very friendly, even shouted my partner a coffee!

Work carried out by the owner/operator
Reviewed on 20-06-2024

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo