Dig trench for underground fibre duct for broadband from Enable and excavate around concrete nib at foot of fence, Trench to be located in centre of driveway which is made of AP60 base, Approximately 50 metres long. (8 m has been dug by hand but I am too old, too slow and stuffed!) Trench to be 300 to 400 mm deep, preferably dug with a narrow bucket excavator. No filling required. Driveway is flat, good access. Pergola across driveway at 2.2 m clearance. Second part is to excavate around nib at bottom of fence (20 m long) in preparation for removal and fence replacement, see photos
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
3.0
|
Communications |
5.0
|
Work carried out by the owner & subcontractors
Reviewed on 05-02-2015
Partner with Builderscrack
Get work