I am going to be renovating my bathroom over Easter. I will be doing all the works including waste myself except for the hot and cold water which need adjusting. I will remove all wall linings and existing fixtures before you get there, so you should have a clear run. The following needs doing by a plumber: - The vanity hot and cold pipes need to be stepped over 500 mm to suit a new vanity. This can be done above floor level (it is a floor standing vanity) - the bath taps need to move around the corner from below the shower head to the middle of the side of the bath (shower over bath) - disconnect header tank and replace with pressure reducing valve, relief valve and what ever else is required to change from low pressure to medium pressure using the existing hot water cylinder. Work needs to be done on the between the 17th to 19th April (19th is Easter Friday) I will provide the tap ware, with you providing everything else including valves.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
The work was done very tidily. Thank you
Work carried out by an employee of the company
Reviewed on 06-05-2019
Partner with Builderscrack
Get work