Membrane roof is being replaced so the header tank on the roof will need to be removed and the lengths of the pipes extended to suit new roof thickness. It may make more sense to replace the header tank with a pressure reducing valve or possibly a mains presure HWC. - I'm open to suggestions.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Really happy, slightly tricky job where a header tank had to be removed and replaced working around a roof replacement. There were many delays to the roof replacement but Paul was able to reschedule to work with the weather and the roofers.
Work carried out by the owner/operator
Reviewed on 05-04-2019
Partner with Builderscrack
Get work