Hot water cylinder leaking, 40 years old so needs replacing: 180L low pressure, 460mm diameter x 1930mm tall. Access to cylinder in linen cupboard will need shelves removed. Needs to be done soon - like this week (e.g. by 12 Jan 2019).
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
4.0
|
The work done was good; however, although the quote included 'installation and commissioning', it turned out that the electrical connection wasn't included so I needed to get an electrician to do that separately. To his credit, when I realised that the quote wasn't for the whole job, Fraser did say it would be OK if I wanted to get the job done by someone else. There was also a delay due to supplier of the cylinder pushing their delivery date back, but Fraser kept me well informed about that.
Work carried out by the owner/operator
Reviewed on 22-03-2019