A series of small plumbing jobs that can all be done at one time: 1) New taps and waste to small vanity sink 2) Replace laundry tub with similar. 3) New toilet cistern or replace whole set (waste is right hand exit when looking at front of pan) No water stop valves now on any of the piping. I will supply 1 and 2 but you would supply misc parts such as flex connectors if you chose to use those. 3 is all down to you.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Used clear instead of white sealant on sink. Did not clean or tape off excess properly. Core plumbing work well executed
Work carried out by the owner/operator
Reviewed on 23-10-2017
Partner with Builderscrack
Get work