Review

Toilet plumbing for tiling.

Job image

Job description

Toilets
Christchurch

Prepare in wall cistern and toilet prior to tiling. Fit and test on completion.


Review

Workmanship
4.0
Cost
4.0
Schedule
5.0
Communications
5.0

Work carried out by the owner/operator
Reviewed on 30-01-2017

Tradesperson reply
"The finished floor was tiled and had a gradient, leaving a 15mm gap at the front of the toilet, that meets the tile. If a levelling compound had been applied prior to tiling, the toilet fit off would have looked a lot neater with the sealant bead."

Verified Builderscrack review

Trade professionals

#1 Tradie 1 No recent reviews 33 jobs Secured job
#2 Tradie 2 No recent reviews 131 jobs No longer in contact
#3 Tradie 3 No recent reviews 211 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo